Banner


Riverstone Reports Multiple High Grade Gold Intercepts at Yaramoko PDF Print E-mail
Wednesday, 05 October 2011 06:52

Riverstone Resources Inc. reported additional positive results from the drilling program on the Yaramoko gold permit in Burkina Faso, West Africa.

Assays include data from an additional 8 diamond drill holes on Bagassi Central (See maps on Website). A total of 40 diamond drill holes were drilled on Bagassi Central in the summer program. The results of 13 holes were reported on September 7, 2011 and assays are pending for the remaining 19 holes.

Highlights Include:

• 53.6 gpt Au over 8 metres (including 178.3 gpt Au over 2 metres) in YRM-11-DDH-021

• 47.4 gpt Au over 8.5 metres (including156.9 gpt Au over 2 metres) in YRM-11-DDH-018

• 37.7 gpt Au over 16 metres (including 73.8 gpt Au over 7 metres) in YRM-11-DDH-024

• 100.6 gpt Au over 4 metres (including 177.0 gpt Au over 2 metres) in YRM-11-DDH-023

"We are very pleased with these results from the Yaramoko drilling program," commented Michael D. McInnis, President and CEO of Riverstone Resources. "These results continue to confirm and expand the high-grade gold intercepts that were previously reported for this zone in news releases dated April 8 and September 7, 2011. These results confirm that this is an important high-grade gold discovery that remains open for expansion."

More information, click here.

Bookmark this page!
Ask.com del.icio.us Digg.com Facebook folkd.com Google Hao Hao Report Netscape StumbleUpon Technorati Webnews Mister Wong Yahoo

 



Stay informed, receive our monthly newsletter!

We have 776 guests online

Mining Reporter Portal - The International Journal for Mining, Tunnelling, Equipment and Technology - Made in Germany
hoisting technology and mine-shaft infrastructure Siemag Tecberg http://www.siemag-tecberg.com
tunnel construction boring machine tunnelling  shaft sinking machines drilling horizontal mechanized Schwanau traffic
Universa 50 versatile carrier vehicle payloads up to 15 tons
www.used-crushers.de www.crushers.de ENDERS Crushers + Screens Crushers Jaw crusher single- double-toggle Roller crusher Impact crusher Hammer crusher Cone crusher Ball Tube mill
http://www.hese.de
http://www.indurad.com
http://www.thiele.de
Hauhinco Maschinenfabrik machine works, engineering works, pumps, high-pressure pumps, plunger pumps, water hydraulics, water-hydraulics, extruding machine, hydraulic extruder, pumps for mining, pumps
International,Geothermie-Konferenz,2012,Freiburg,Home,Workshop,Short,Course,Kongress,Konzerthaus,Mai,Opening,Lounge,Business,Impressionen
MEYCO Global Underground Construction - part of BASF Construction Chemicals
http://www.akersolutions.com/wirth
Tools for drilling and rockbolting Drill bits Drill rods Drill shanks Drag bits Sleeves and adapters
vge-strata-control-in-in-seam-roadways german deep coal mining expertise
Thyssen Schachtbau GmbH
http://www.emp-antriebstechnik.de
http://www.kirchgaesser.de
Cool Air and a Fresh Breeze in Mining and Tunnelling - We care for You - Herco-gmbh.com
Self-propelled working platform and standard telescopic-swivel loader combined in one machine
Cool Air and a Fresh Breeze in Mining and Tunnelling - We care for You - Tunnel-Ventilation.de
DEBRIV, Bundesverband Braunkohle,
China International Forum and Epo on Coal Industry 2012
PC-Soft GmbH is positioning itself on the market as one of the first and leading providers of integrated software
gta, maschinensysteme, tunnelling, mining, roadheading, galleries, driving, support setting, transport, monorail, racks, drilling, bolting
A world-leading provider of equipment and services for the mining and construction industries. The product range includes rock tools, breakers and demolition tools, drilling, loading and hauling, crus
Becker Mining Systems Energy Distribution Automation Communication Transportation Roof Support
http://www.dh-shaftsinking.com
http://www.exguide.de
Spezialmaschinen und Komponenten fuer Anwendungen im Berg- und Tunnelbau
VGE Verlag GmbH - Montebruchstraße 2, D-45219 Essen - Germany - Tel. + 49 (0) 20 54 / 924-0 - Fax + 49 (0) 20 54 / 924-109 - E-Mail: info@vge.de
Layout / Technische Umsetzung: www.denkbetrieb.de - Ihre Full Service Werbeagentur im Ruhrgebiet koordination und abwicklung: moduscom unternehmenkommunikation manfred könig