|
Riverstone Resources Inc. reported results from a further 21 Reverse Circulation drill holes on the Goulagou I Zone, which forms part of the company's flagship Karma Gold project in Burkina Faso, West Africa.
This drilling was designed to infill the deposit at 50 metre spacing and also to expand the mineralized zone along strike. These latest results have extended the Goulagou I deposit a further 150 metres to the west, and the deposit remains open along strike in both directions and at depth. Mineralization has been extended to a distance in excess of 2,100 metres on this deposit and the width of the mineralized zone varies from 50 metres at the east end up to 300 metres in the west. Significant assay intervals are as follows: • 1.33 g/t Au over 52 m, including 2.38 g/t Au over 12 m, in RC-254 • 1.10 g/t Au over 16 m in RC-252 • 1.05 g/t Au over 12 m, 2.37 g/t Au over 6 m and 1.39 g/t Au over 10 m in RC-234 • 1.55 g/t Au over 10 m and 0.79 g/t Au over 18 m in RC-237 • 1.40 g/t Au over 8 m in RC-244 "We are impressed to see higher grade gold mineralization that extends the overall strike length of the Goulagou I deposit which continues to be expanded and it is still open along strike" commented Dwayne Melrose, President of Riverstone. "Riverstone is systematically expanding and defining the deposit for the upcoming future resource estimation". More information, click here. |