Sandspring Resources Ltd. Continues to Report Positive Drill Results From Its Toroparu Project
Wednesday, 21 December 2011 13:26
Sandspring Recources Ltd. announced additional results from its 2011 infill-drilling program at the Toroparu Gold Deposit in the Republic of Guyana, South America.
The reported holes TPD 275-285, represent an additional 5,167 m of diamond core drilling within the Main East Zone of the Toroparu Deposit area. A total of 65,833 m of results have now been reported from the 2011 Drill Program; with a total of 136,552m of drilling reported to date from the Toroparu Deposit.
Highlights include:
124.5m of 1.44 g/t Au in drill hole TPD 278
127.5m of 1.83 g/t Au (0.15% Cu) including 19.5m of 4.07 g/t Au (0.35% Cu) in TPD 280A
88.5m of 1.01 g/t Au including 43.5m of 1.39 g/t Au (0.09% Cu) in TPD 282