Banner


BHP Billiton Becomes First Operator To Bring New Deepwater Production Well Online Since Moratorium PDF Print E-mail
Tuesday, 07 June 2011 09:46

BHP Billiton Petroleum announced today that it is the first company in the deepwater Gulf of Mexico to bring a newly drilled well into production since the moratorium was enacted in May 2010. 

The well was brought into production on 30 May 2011 on the BHP Billiton operated Shenzi field.

The SB-201 well was drilled to a total measured depth of 25,126 feet and is currently producing approximately 17,000 barrels of oil per day. This is the eleventh producing well within the Shenzi field and our ongoing development program will ensure that this operated tension-leg platform (TLP) remains a significant contributor to BHP Billiton's high value, Gulf of Mexico production.

BHP Billiton Petroleum Chief Executive, J. Michael Yeager, said, "We are pleased to be able to demonstrate that deepwater drilling and production can resume in a safe and reliable manner. Our organisation has worked very hard over the past several months with regulators to have the ability to resume drilling operations and add new production to our deepwater Gulf of Mexico portfolio."

BHP Billiton Petroleum also received approval and began drilling a second deepwater production well (SB-101) on the Shenzi field on 2 June 2011.

The Shenzi facility is located approximately 120 miles (195 kilometres) off the Louisiana coastline and is installed in approximately 4,300 feet (1,300 metres) of water on Green Canyon Block 653, making it the second deepest TLP in the world. The overall field comprises four blocks: Green Canyon 609, 610, 653 and 654.

BHP Billiton Petroleum is the operator with 44 percent equity. Joint interest participants are Hess Corporation and Repsol, each with 28 percent equity.

Bookmark this page!
Ask.com del.icio.us Digg.com Facebook folkd.com Google Hao Hao Report Netscape StumbleUpon Technorati Webnews Mister Wong Yahoo

 



Stay informed, receive our monthly newsletter!

We have 734 guests online

Mining Reporter Portal - The International Journal for Mining, Tunnelling, Equipment and Technology - Made in Germany
http://www.preinfalk.de
WOELKE - Monitoring and measuring devices for coal mines (ventilation/concentration sensor, transmitter, monitor, alarm) - Mining Security Made in Germany
http://www.denkbetrieb.de
http://www.emp-antriebstechnik.de
http://www.kirchgaesser.de
vge-strata-control-in-in-seam-roadways german deep coal mining expertise
http://www.akersolutions.com/wirth
Universa 50 versatile carrier vehicle payloads up to 15 tons
http://www.dh-shaftsinking.com
Spezialmaschinen und Komponenten fuer Anwendungen im Berg- und Tunnelbau
Thyssen Schachtbau GmbH
Hauhinco Maschinenfabrik machine works, engineering works, pumps, high-pressure pumps, plunger pumps, water hydraulics, water-hydraulics, extruding machine, hydraulic extruder, pumps for mining, pumps
Tools for drilling and rockbolting Drill bits Drill rods Drill shanks Drag bits Sleeves and adapters
http://www.cft-gmbh.de
http://www.hese.de
Cool Air and a Fresh Breeze in Mining and Tunnelling - We care for You - Herco-gmbh.com
Becker Mining Systems Energy Distribution Automation Communication Transportation Roof Support
PC-Soft GmbH is positioning itself on the market as one of the first and leading providers of integrated software
China International Forum and Epo on Coal Industry 2012
http://www.thiele.de
RAG Mining Solutions
tunnel construction boring machine tunnelling  shaft sinking machines drilling horizontal mechanized Schwanau traffic
http://www.bucyrus.com
Cool Air and a Fresh Breeze in Mining and Tunnelling - We care for You - Tunnel-Ventilation.de
hoisting technology and mine-shaft infrastructure Siemag Tecberg http://www.siemag-tecberg.com
International,Geothermie-Konferenz,2012,Freiburg,Home,Workshop,Short,Course,Kongress,Konzerthaus,Mai,Opening,Lounge,Business,Impressionen
LHD-Loader PFL - payloads 1,5 t - 5,5 t  - optimum solution mining tunnelling
Self-propelled working platform and standard telescopic-swivel loader combined in one machine
MEYCO Global Underground Construction - part of BASF Construction Chemicals
VGE Verlag GmbH - Montebruchstraße 2, D-45219 Essen - Germany - Tel. + 49 (0) 20 54 / 924-0 - Fax + 49 (0) 20 54 / 924-109 - E-Mail: info@vge.de
Layout / Technische Umsetzung: www.denkbetrieb.de - Ihre Full Service Werbeagentur im Ruhrgebiet koordination und abwicklung: moduscom unternehmenkommunikation manfred könig