Gold Resource Corporation Produces First Concentrates From El Aguila Mill Denver PDF Print E-mail
Friday, 05 February 2010 08:22

Gold Resource Corporation (GRC) (OTCBB: GORO, FRANKFURT: GIH) is pleased to announce first concentrate production at its El Aguila Project Mill, located in Oaxaca, Mexico. 

Gold Resource Corporation’s El Aguila mill startup on January 25, 2009 has led to the first concentrates produced from the mill’s initial flotation circuit on February 2, 2010 from the Company’s El Aguila open pit gold and silver ore. 

William W. Reid, President of Gold Resource Corporation stated, “We are very pleased with successful concentrate production from our El Aguila mill. I want to thank all our El Aguila Project management team and employees, Lyntek’s engineering and construction management team and all the contractors for their excellent work in achieving this milestone. We also want to thank Hochschild Mining for their continued financial and technical support. Gold Resource is fortunate to have put together such a talented and excellent team for the El Aguila Project”. 

Mr. Reid continued, “We will now be in this initial start-up mode through the month of February as we continue operator training as well as flotation circuit optimization. We target achieving “Commercial Production” sometime in March. Commercial Production is declared when the mill throughput and mill recoveries are at least 80% of the mill design. During this optimization period we will be running lower grade ore. First quarter results will reflect this optimization and lower production rate as we ramp up to Commercial Production.” 

Mr. Reid stated, “This is a good time to have a new mine coming on line as we are in unprecedented times in the gold market. We see 2010 as one of increasing shareholder value as we ramp up production, generate increasing cash flows, continue to explore the exceptional potential of this high-grade mineralized system and accelerate development of our second and largest mine, the Arista underground gold-silver deposit with significant copper-lead-zinc credits.”

Bookmark this page!
Ask.com del.icio.us Digg.com Facebook folkd.com Google Hao Hao Report Netscape StumbleUpon Technorati Webnews Mister Wong Yahoo

 



Stay informed, receive our monthly newsletter!

We have 263 guests online

vge-strata-control-in-in-seam-roadways german deep coal mining expertise
http://www.indurad.com
http://www.preinfalk.de
MEYCO Global Underground Construction - part of BASF Construction Chemicals
Tools for drilling and rockbolting Drill bits Drill rods Drill shanks Drag bits Sleeves and adapters
PC-Soft GmbH is positioning itself on the market as one of the first and leading providers of integrated software
http://www.cft-gmbh.de
http://www.exguide.de
Cool Air and a Fresh Breeze in Mining and Tunnelling - We care for You - Herco-gmbh.com
Spezialmaschinen und Komponenten fuer Anwendungen im Berg- und Tunnelbau
tunnel construction boring machine tunnelling  shaft sinking machines drilling horizontal mechanized Schwanau traffic
Universa 50 versatile carrier vehicle payloads up to 15 tons
Self-propelled working platform and standard telescopic-swivel loader combined in one machine
DEBRIV, Bundesverband Braunkohle, Braunkohlenforum Die Braunkohle bekommt hochrangige Botschafter
http://www.thiele.de
VGE Verlag GmbH - Montebruchstraße 2, D-45219 Essen - Germany - Tel. + 49 (0) 20 54 / 924-0 - Fax + 49 (0) 20 54 / 924-109 - E-Mail: info@vge.de
Layout / Technische Umsetzung: www.denkbetrieb.de - Ihre Full Service Werbeagentur im Ruhrgebiet koordination und abwicklung: moduscom unternehmenkommunikation manfred könig